标准文件翻译典型案例
XX公司产品标准 20万字
XX酒店建造施工标准 60万字
欧标 10万字
标准文件翻译参考书
标准文件翻译示例
原文
2.2 Draft Review
2.2.1 Initial Draft
This is the activity done predominately by the DP Author. First, the DP Author works with the Approving CCE and the Leadership Team to define the scope of the DP. With the scope of the DP, the reviewers for the DP, and the DP due date known, the Author writes and integrates portions from the DP Team into the final document. If there is no DP Team, then the Author writes the entire DP, consulting with others in the Owning Engineering Organization as necessary to complete the task. The Author, the DP Team, and DP Coordinator meet on an as needed basis to assure that progress is being made. When finished with the Initial Draft, the DP Author makes all files available to the reviewers and promotes the DP to Initial Review.
2.2.2 Initial Review
This is the first review of the DP. The DP Author has made the DP available to all reviewers the Leadership Team has identified. This review covers all aspects of the DP, both technical and grammatical. The Approving CCE should not be forced to perform a readability or grammatical review during the Final Approval state. All of those comments should be made and resolved now.
2.2.3 Final Draft
The final step, before the DP is given to the Approving CCE for Final Approval, is the Final Draft when the DP Author resolves any minor comments which might exist. The DP Author places all of the pertinent files in the eDP folder, including the DP itself, the DP checklist, any calculation spreadsheets, lists of pertinent similar designs if needed, etc.. The DP is promoted either by the DP Author or the DP Coordinator.
译文
2.2 草案评审
2.2.1 初步草案
该工作主要由 DP 作者完成。首先,DP 与批准 CCE 和领导小组共同定义 DP 范围。在该 DP 范围内,DP 评审人(知悉 DP 的到期日期)和作者编写并整合来自 DP 小组的其他内容以形成最终文件。如果不存在 DP 小组,则由作者编写整个 DP,并在必要时咨询所属工程单位的其他人员以完成该任务。作者、DP 小组及 DP 协调人在必要时举行会议确保上述工作的进行。在完成初步草案后,DP 作者向评审人提供所有准备好的文件并推动 DP 进入初步评审。
2.2.2 初步评审
这是 DP 的首次评审。DP 作者将准备好的 DP 提交给领导小组指定的所有评审人。评审涵盖 DP 技术和文法的各个方面。在最终批准状态期间,批准 CCE 不再进行可读性或文法评审。应在本阶段提出这些方面的意见并加以解决。
2.2.3 最终草案
最后的步骤是最终草案,它排在作者解决了 DP 所有可能存在的少量意见之后、在将 DP 提交给批准 CCE 最终批准之前。DP 作者将所有相关文件放入 eDP 文档夹,其中包括 DP 本身、DP 检查表、所有计算表格、相关类似设计列表(如果有)等。DP 由 DP 作者或 DP 协调人推动。
|